Installation Process

Home > Products > Installation Process
  • Setting the line and carrying the board in positionEject double lines of board thickness up and down the axes of installed wall board, easily carry the panel to the side of wall according to the required specification.
  • Sawing boardUsing hand-hold electric saw to saw freely according to the specification of wall.
  • SizingSpread polymer mortar on one tenon side casually.
  • InstallationCarrying the panel to the installation place, correcting the wall board by gavelock and making it tightly close, and let the polymer mortar squeeze out into full and fixing it with a chock temporarily.
  • Correcting、FixingUsing a guiding rule of two meters or longer to check verticality and leveling correction, then using 6mm or 8mm reinforcing steel bar and using the construction sealant to fix.
  • Grouting and filling starchFilling and strickling the corrected wall panel with polymer mortar, filling the big gap with pea gravel concrete.
  • Stick anticrack tapeClean dirt of each cement gap and stick anticrack tape.
  • Installing electrical wires and switchesSetting lines on the places needing to be set with concealed wire and switch box, then cut a groove by hand-hold electric saw,filling with polymer mortar after installation。
  • Installing doorcasePreparing a door and window hole on the installed wall, anchoring by the splint or lines.
  • Facing coating and wall papersScraping putty powder directly without plastering on the installed wall,then brushing coating and sticking wall paper.
  • Facing cermic tile,decorative sheetSticking ceramic tiles or other wood facing panels casually without plastering on installed wall.
  • Eelectric apparatus installationInstall lights,furniture,air-conditioners casually on installed room, nailed or hanged.

Hot News

主站蜘蛛池模板: 午夜在线观看免费视频 | 午夜视频网站 | 日干夜操 | 亚洲欧美在线综合一区二区三区 | 欧美亚洲国产精品久久第一页 | 亚洲高清影院 | 亚洲福利视频网 | 日本不卡一区二区三区在线观看 | 五月一区二区久久综合天堂 | 天天做天天爱天天操 | 亚洲人成在线播放网站岛国 | 亚洲欧美中文日韩v在线观看 | 天天视频网 | 七月丁香八月婷婷综合激情 | 天天做天天添婷婷我也去 | 欧美怡春院一区二区三区 | 四虎成人在线视频 | 在线bt天堂网www在线下载 | 青春草在线观看播放免费视频 | 色视频网站色视频播放 | 天干夜天天夜天干天 | 色综合天天综合网国产成人网 | 欧美一级做a爰片免费 | 日本国产一区二区三区 | 日日天天干 | 在线观看理论片免费韩国 | 青草视频在线观看完整版 | 午夜黄色福利视频 | 日本伊人网 | 亚洲二区在线播放 | 色综合久久中文综合网 | 青娱乐最新官网 | 日本三区四区免费高清不卡 | 日韩视频第二页 | 在线视频综合网 | 中文字幕精品亚洲无线码二区 | 最新欧美伦禁片在线观看 | 四虎影永久在线高清免费 | 亚洲天堂影视 | 日本一区二区三 | 四虎在线永久精品高清 |